Showroom

   

NEMA 3R Stainless Construction

 

 Description & Image

 

NEMA 3 Painted Steel Construction

 

 

 

Description & Image

 

 

DRV has designed a heavy-duty NEMA 3R enclosure that provides excellent protection for sophisticated electrical equipment mounted outdoors. The enclosure meets all NEMA 3R requirements, carries an Underwriters Label (UL), and has available an optional UL 508A label for custom control panels.

 Showroom

 

  Multi-Axis Servo System

 

  DRV Dual Compressor Bubbler System

 

  DRV Duplex Pump Control

 
  NEMA 3R Construction
 
  VFDs - HM, MCC, NEMA 12 Construction
 
  Quadraplex Pump Control System
 
  Space Saver Construction
 
 
 
  Mailing Address:

 

 

  Pittsburgh Office
  1 DRV Drive
  Pittsburgh, PA 15221
  Phone : (412) 247-4816
  Fax : (412) 247-0821

 



 

 

  Ohio Office
  50 Pearl Road, Suite #310
  Brunswick, OH 44212

  Phone: (330) 220-0520
  Fax: (412) 247-0821

 

 

 

 


 

 

 

 

 

 

 

 

 

 

 

 


 

 A Registered COSTARS Supplier

 © 2011 DRV Incorporated, All Rights Reserved